
The Loop 101 Improvement Project in Phoenix was a $108 million infrastructure upgrade designed to reduce congestion and improve traffic flow on one of the city’s busiest freeway corridors. GTS partnered with contractors and ADOT to provide geotechnical investigations, construction materials testing, and inspection services for bridge widening, ramp reconstruction, and pavement resurfacing.
The project widened Loop 101 by one general-purpose lane in each direction, requiring extensive engineering and materials support. Key scope elements included:
GTS’s role was to verify that subgrade soils, aggregates, and pavement materials met ADOT and ASTM standards for quality and performance.
Our materials testing laboratory and field teams conducted a comprehensive testing program, including:
Testing and inspection services provided real-time quality control, allowing construction teams to adjust quickly and maintain project schedules.
In addition to laboratory verification, GTS provided:
Our deliverables gave ADOT and contractors the confidence that all materials met safety, durability, and compliance requirements.
The Loop 101 Improvement Project was completed successfully, providing Phoenix with:
GTS’s expertise in geotechnical engineering, construction materials testing, and inspection services played a vital role in delivering one of Phoenix’s most important highway improvement projects.